当前位置: 首页 > 文章 > 云龙湖水库汛限水位调整的分析 农业灾害研究 2017 (3) 38-39
Position: Home > Articles > Analysis on Adjustment of Flood Control Level of Yunlong Lake Reservoir Journal of Agricultural Catastrophology 2017 (3) 38-39

云龙湖水库汛限水位调整的分析

作  者:
刘田田;房磊;邢亚;刘融融
单  位:
江苏省水文水资源勘测局徐州分局;江苏省水文水资源勘测局盐城分局
关键词:
云龙湖水库;汛限水位;设计洪水;调洪演算
摘  要:
水库汛限水位是水库在汛期允许兴利蓄水的上限水位,其值的大小对于水库防洪、兴利效益的发挥至关重要。以江苏省徐州市云龙湖水库汛限水位调整为例,经洪水设计、调洪演算,得出云龙湖水库100年一遇设计水位为34.93 m,2 000年一遇校核洪水位为35.78 m。
译  名:
Analysis on Adjustment of Flood Control Level of Yunlong Lake Reservoir
作  者:
LIU Tian-tian;Xuzhou Branch of Jiangsu Hydrology and Water Resources Investigation Bureau;
关键词:
Yunlong lake reservoir;;Flood control level;;Design flood;;Storage routing
摘  要:
The flood control level of reservoir is the upper limit water level of reservoirs which can be allowed to accumulate in the flood season. The value of the level is very important for the flood control and utilizable benefit. Taking the adjustment of flood control level of Yunlong Lake Reservoir in Xuzhou City of Jiangsu Province as an example, the hundred-year design level of Yunlong Lake Reservoir is 34.93 m by the flood design and storage routing. The 2 000-year check flood stage is 35.78 m.

相似文章

计量
文章访问数: 11
HTML全文浏览量: 0
PDF下载量: 0

所属期刊

推荐期刊