当前位置: 首页 > 文章 > 阿坝州汶川特大地震林业损失及灾后重建措施 四川林勘设计 2009 (2) 12-17
Position: Home > Articles > Forestry Loss and Post-disaster Reconstruction Measures in Aba after the Wenchuan Earthquake Sichuan Forestry Exploration and Design 2009 (2) 12-17

阿坝州汶川特大地震林业损失及灾后重建措施

作  者:
邱兴银;斯旦真
单  位:
阿坝州马尔康县林业局资源管理股;阿坝州林业局森林资源管理站
关键词:
汶川地震;林业损失;灾后重建;对策
摘  要:
调查分析"5.12"汶川特大地震对阿坝州森林资源、生态系统、重点工程、林业产业、基础设施等方面造成的损失,据此提出了认真编制总体规划和实施方案、加强森林资源保护管理、精心组织生态系统恢复重建、推进林业基础设施建设、提高林业产业水平等七项灾后重建措施。
译  名:
Forestry Loss and Post-disaster Reconstruction Measures in Aba after the Wenchuan Earthquake
作  者:
QIU Xing-yin1,SI Dan-zhen2(1.Forstry Resources Management Station,Forestry Bureau of Aba Autonomous Prefecture,Maerkang 624000,China;2.Forestry Bureau of Maerkang County,Maerkang 624000,China)
关键词:
Wenchuan earthquake,Forestry loss,Post-disaster reconstruction,Countermeasures
摘  要:
Analyzed the losses of forest resources,ecological system,key projects,forestry industry,infrastructures and other aspects caused by "5.12" Wenchuan earthquake,this paper put up seven post-disaster reconstruction measures such as compiling general plan and implementation plan earnestly,strengthening the protection and management of forest resources,advancing forestry infrastructures building and enhancing the level of forestry industry.

相似文章

计量
文章访问数: 19
HTML全文浏览量: 0
PDF下载量: 0

所属期刊

推荐期刊