强夯后沉降量计算值的分析

作  者:
邢宗强;李万有
单  位:
黑龙江省城市规划勘察设计研究院
关键词:
强夯法;沉降量计算;地基处理;结果分析
摘  要:
以江铜瓮福化工有限公司40万吨/年硫酸厂房工程为例,在强夯法处理地基沉降时,对强夯后计算的最终沉降量与实际平均沉降存在的差异提出问题。通过反算,分析造成这一结果的原因,为今后在强夯法处理地基的计算提供参考。
译  名:
Analysis Of Settlement Calculated Value After Force Ramming
作  者:
Xing Zongqiang Li Wanyou(City Plan Reconnaissance And Research Institute Of Heilongjiang Province)
关键词:
forcing ramming;settlement calculation;foundation treatment;result analysis
摘  要:
Taking the engineering of sulfuric acid workshop with annual production of 400 thousands tons in Wengfu chemical industry Co.Ltd.,this paper points out the difference of final settlement after forcing ramming and actual average values.It also analyzes the causations through inverse computation to provide reference for the calculation of using forcing ramming to deal with foundation.